Welcome to the "Xiao Q Quality Classroom" column! This column is carefully created by Xiwitech, focusing on sharing practical experience in quality management. Here, Xiao Q will become a hands-on expert, guiding everyone to use professional tools, break down real industrial scenarios, and explore solutions together!


This Issue's Topic

The failure rate of the new pump body has been cut in half, so why does the quality manager still refuse to approve expanded use?


Note: This article uses a set of reproducible production scenario simulation data (48 independent prototypes) to demonstrate the workflow. It does not represent the production records of any company. Interfaces, graphics, and values are based on actual outputs from Xiwitab machines.


On-Site Issue

Before Wednesday's review meeting, Zhang, the pump body quality lead, had two sets of survival curves frozen on his screen. The new design had a survival probability of about 0.833 over a 1,500-hour mission, while the old version was only around 0.375—a significant difference (P<0.001). The R&D team couldn’t hide their excitement, but the client rep frowned and asked, “We only care if it can get past the 75% mark.” At that moment, the exact one-sided 95% lower bound report showed 65.8%—and that number instantly silenced the room.


01.On-site conflict: Half of the failures, so why can't it be cleared?

This large industrial pump manufacturer supplies circulating pumps for automated cleaning lines. Customers run the cleaning loops continuously, and seal leaks can cause downtime, pump replacements, and re-cleaning. Both sides agreed to validate a 1,500-hour task period under frozen flow, pressure, temperature, and speed, with reliability of at least 75%, and a single-side 95% confidence lower limit also must reach 75% before considering wider deployment.


The old pump’s seal seat ring was listed as a potential leak cause. Although the new pump's design was adjusted, a two-week morning shift check showed that failures actually occurred less frequently with the new version. R&D hopes to approve the replacement plan at Wednesday’s 4 p.m. review meeting, but the quality lead needs to confirm: is the new version just observed for a shorter time? Were non-failed units removed from the statistics table? Were the two designs assigned to different lots or positions?


"Promoting a design without sufficient evidence carries the risk of leaks to the customer’s production line; only looking at failure counts while ignoring total runtime could also miss valuable structural improvements," Engineer Zhang wrote in the meeting minutes.


02.First, clarify the record standards—draw the conclusion first

Conclusion: The data has been verified and is correct, none of the 48 prototypes are missing, deletion handling was appropriate, the issue isn't with the records, it's that the lower limit didn't meet the threshold.

This conclusion comes from checking each unit one by one. Each pump body takes up one row, recording the sample number, design version, manufacturing batch, shelving order, operating hours (h), censoring mark, failure phenomena, and test bench. Operating hours are accumulated from the common test start point, minus downtime, and the first time it reaches the sealing leakage criterion is recorded as failure. Repeat failures after repair shouldn’t be included in this survival record.  


All prototypes were observed up to 1,800 hours. A censoring mark of 0 means first failure, and 1 means not failed by the cutoff. The latter just means the unit has run up to the cutoff; its final lifetime is still unknown. Simply removing these units or treating 1,800 hours as their failure time would change the conclusion.  


First, in Xiwitab, go to “Statistics → Basic Statistics → Show Descriptive Statistics,” select operating hours and censoring mark, and group by design version, manufacturing batch, and test bench; keep N non-missing, N* missing, total, minimum, and maximum. In the report, N is the number of non-missing, N* is the number of missing, and “total” in the censoring mark row represents the number of units not failed by the cutoff.


图1.png

Figure 1 Example of position review for the old version of Batch A: two positions, each with 6 units and no missing fields.


In the combination of four versions and batches, there are 6 units at each station. The new version has 8 units failing for the first time and 16 units censored without failure, while the old version has 18 and 6 units, respectively. Counting balance weakens the explanation that the sample was concentrated at a certain station, but it cannot prove station equivalence. The trial supervisor still needs to check each unit for time deductions, instrument calibration, consistent working conditions, and reasons for sample removal.


All censored units without failure were recorded at 1,800 hours, so this main analysis uses fixed-time censoring. This condition allows both groups to use the same observation limit and can no longer be applied to records removed early or lost to follow-up. Censoring should also be unrelated to potential failure risk; for example, you can’t remove a sample just because you hear an unusual noise and then treat it as a normal observation ending.


03.How does a survival curve address design differences

In 'Statistics → Reliability/Survival → Distribution Analysis (Right Censoring) → Nonparametric Distribution Analysis', set the runtime as the variable and group by design version; for censoring, choose 'Time Censored at 1800'. For estimation, select Kaplan-Meier, survival probability, 95% confidence level, and lower limit; for results, include log-rank and Wilcoxon statistics; for graphics, select survival plot, overlay on the same chart, and leave the upper limit on the x-axis blank. 


The Kaplan-Meier estimate adjusts the survival rate at each failure based on the number of prototypes still under observation at that time. Right-censored prototypes provide observation information before withdrawal, and their withdrawal itself doesn't cause a drop due to failure. The height of the survival curve indicates the estimated probability of not having failed yet from the start of the test to the corresponding time point.


图2.png

Figure 2 Xiwitab survival curve coordinate area. The blue solid line is the new version, and the red dashed line is the old version. The horizontal axis is in hours.


The two main curves show a separation during the observation period. The thin lines in the graph represent the platform intervals; during the task period, the assessment is based on reading the one-sided probability table and precise method results, not by visually judging the position of the thin lines. In the new version, there were no new failures between 1,450 and 1,600 hours, so the estimate at 1,500 hours continues to use the platform value for that segment.


The Xiwitab report shows that the new version has a 1,500-hour survival probability of about 0.833, with a one-sided 95% normal lower limit of about 0.708; the old version is about 0.375 and 0.212, respectively. The point estimates differ by roughly 45.8 percentage points. The curve for the new version hasn’t dropped to 50% yet, so this batch of data can’t give a recognizable median lifespan, nor can it be extrapolated beyond the observed upper limit.


04.Judge significant differences and customer thresholds separately

The log-rank test looks at whether the overall survival experiences of the two groups are the same; it doesn’t specifically test the 75% reliability threshold at 1,500 hours. Xiwitab’s log-rank chi-square is 11.15040 with 1 degree of freedom, showing a P-value of 0.001; the Wilcoxon chi-square, which leans more on earlier events, is 11.85103 with a P-value also showing 0.001. The P-values are rounded in the interface, and both tests use the same batch of prototypes, so they can’t be considered two independent validations.


Under small samples, the lower limit of the normal approximation still needs to be checked. In the new version, before 1,500 hours and at that time point, there were 4 first failures in total, and the remaining 20 units completed the task; all 24 units were observed enough to determine the success or failure of this task. Then use 'Statistics → Basic Statistics → Single Proportion', select summary data, events 20, trials 24; set options to 95%, proportion greater than direction, and exact method, without checking hypothesis testing.


图3.png

Figure 3 Xiwitab survival curve plot area. The solid blue line is the new version, and the dashed red line is the old version. The horizontal axis is in hours.



图4.png

Figure 4 Xiwitab survival curve plot area. The solid blue line is the new version, and the dashed red line is the old version. The horizontal axis is in hours.


The original report states that using the Clopper-Pearson exact method, the task success rate is 0.833333, with a one-sided 95% lower limit of 0.658193. This aligns with the point estimate from survival analysis, and the lower limit differs from the 0.708 from the normal approximation because the interval construction methods are different. Both lower limits are below 0.75, so this batch of results still doesn't meet the criteria for expanded use. This check reflects the impact of small-sample interval methods, and the prototype is still the original 24 units.


05.Put the conclusion into practice for the next check

The quality manager should hold off on expanding use and keep the new version as a candidate for continued validation. If engineering review allows limited trial use, the operating conditions, quantity, and locations must be restricted, standby pumps should be prepared, and clear rules for stopping use immediately in case of leakage must be established. Review documents should not state 'the new version meets 75% reliability requirements.'


R&D should review the deformation of the seal seat and leakage mechanisms, and the test supervisor should check records and equipment status for two batches and two positions. Current grouping balance cannot rule out untested condition differences, nor can statistical associations directly prove that structural changes are the cause. If multiple parameters need adjustment, use DOE for screening and confirmation; if lifespans under different loads need explaining, then select the appropriate lifetime regression and check model assumptions.


Supplementary validation should include new manufacturing batches and independent prototypes. The quality manager must determine task duration, sample size, failure criteria, and acceptance rules before starting, and should not rely on repeatedly checking results or stopping once significance is reached. After the new prototypes complete 1,500 hours, reevaluate the accurate one-sided 95% lower limit; only if it reaches 75% and there are no anomalies in operating conditions or measurements should expanded use be considered.


During the first 90 days of limited customer trials, record valid operating hours, first failures, and reasons for sample withdrawal for each unit. If a seal leaks, immediately stop promotion and keep the faulty part for mechanism investigation. If a test is stopped early, keep the actual censoring time and reselect analysis settings; do not simply mark it as a success.