Welcome to the "Xiao Q Quality Classroom" column!
This column is carefully created by Xiwitech, focusing on sharing hands-on experience in quality management. Here, Xiao Q will become a practical expert, guiding everyone to use professional tools, break down real industrial scenarios, and explore solutions together!
This Issue
How to detect if measuring tools drift over time
On-site problem: Measuring the same 25.000 mm standard piece with the same tool every day, the readings gradually go from close to 25.0000 mm to 25.0050 mm. What production really needs to know isn’t whether it exceeds tolerance on a particular day, but whether the tool itself drifts over time and whether it can return to a controlled state after cleaning, warming up, and zeroing.
In conclusion, first, look at the Xiwitab gauge run chart for daily repeatability analysis with the same standard parts, operators, and gauges; the I-MR chart is used to pull out time-sequence and special-cause signals. The baseline I-MR center was 25.0016mm, with 24 points out of control in the original report; after verification, the center showed 25.0000mm, with control limits from 24.9995 to 25.0006mm, and no special-cause results appeared on the panel.

*Note: This article uses a set of reproducible production scenario examples to show the workflow and does not represent the production records of any company. The interface, graphics, and values are all based on actual outputs from Xiwitab machines.
01.on-site conflict
Before starting work each day, the quality inspection station checks the measuring tool GM-052 using a 25.000 mm standard piece. The operator is fixed as OP-01, and the measurement readings are kept in order by date. Over the past 30 days, the readings gradually drifted from around 24.9998 mm to 25.0050 mm.
The on-site situation faces multiple questions: Did the measuring tool's zero point shift? Was the standard piece contaminated? Did the environment cause interference? Or did something change in the actual product measurement process?
Many companies only rely on periodic calibration, but a single calibration only reflects the condition at that moment and can't detect gradual drift in the measuring tools over time. The core value of standard parts is to remove the interference from the production process: if the true value of the standard part doesn't change, but the same measuring tool's readings keep drifting over time, the measurement system should be checked first. Only after confirming that the tools are under control can conclusions from control charts and process capability analysis be considered reliable.
For this judgment to hold, three conditions need to be met: the standard part must be traceable; measurement records shouldn't be arbitrarily reordered; and the operator and measuring tools should stay the same throughout the study period.

The engineering criteria for this case are:
The verification window includes 20 daily points, the difference from the mean of 25.0000mm does not exceed 0.0005mm, the readings stay between 24.9985 and 25.0015mm, and the I-MR no longer indicates special cause results.
These criteria are only for this case and do not replace on-site calibration standards.
02.数据可信度

*Figure 1 Baseline data has been entered into Xiwitab, and the first row of fields and date order can be directly checked.

Key tips:
Reference values and actual readings from measuring tools must be in separate columns; 25.0000 mm is the standard reference point and shouldn’t be used as an actual measured value.
Keep the date sequence field, so that the I-MR chart can locate when the drift happened and how big it was.
03.Formal analysis
Software Path Statistics > Quality Tools > Gage Study > Gage Run Chart.
The gage run chart puts consecutive daily readings of the same standard part on a single timeline, keeping site conditions by part number and operator. It shows whether the gage status changes over the days and is suitable as the main entry for daily standard parts.

*Figure 2 Key Field Binding in Gauge Operation Diagram

⚠️Note the limitations:
The numerical scale on the gauge operation chart compresses tiny millimeter-level changes around the 25mm reference. It's used to confirm data structure and time trends but isn't enough to detect small drifts.
To formally diagnose minor drifts, you need to reuse the measurement_mm field and go through the menu: Statistics > Control Chart > Individual Variable Control Chart > IMR, to fully unfold short-term fluctuations and time trends.
*Figure 3 Original Output of Baseline Gauge Operation Chart

*Figure 4 Original output of the verification measuring tool operation chart

04.Diagnostic cross-check
For I-MR analysis, select the variable measurement_mm, strictly following the original row order in the worksheet without rearranging.
I (Individual Chart): Used to check if a single measurement value deviates from the centerline.
MR (Moving Range Chart): Used to see if short-term fluctuations between readings on consecutive days are unusually large.
You need to interpret the two images together to distinguish three types of phenomena: fixed bias, gradual time drift, and sudden increase in measurement fluctuations.
*Figure 5 Baseline I-MR raw output shows a continuous rise and results due to special causes


The baseline chart turned 'the measuring tool might be drifting' from a guess on-site into actionable evidence: the first 14 points and the last 10 points each fell outside the control limits on either side of the centerline, and the latter points were all going in the same direction.
⚠️Risk Reminder:
If you ignore this drift signal and calculate process capability directly using product data, the measurement deviation caused by gauge drift will be mistaken for changes in the product process.
05.Action and Verification
Carry out the corrections according to the order of on-site measurement work: clean the contact surfaces of standard parts and the measuring probe; allow the measuring tools to fully preheat and wait for the equipment to stabilize thermally; zero the measuring tools and re-measure the standard parts.
If the directional drift still exists after completing the full set of operations, an upgrade is needed: calibrate the whole measuring instrument, check the connecting mechanisms, and if necessary, consider scrapping and replacing the instrument. You can't just rely on a single reset to cover up long-term stability issues.

*Figure 6 Verifying that the I-MR native output has no special reason result panel

The native graphic display center of the verification window is 25.0000 mm, with control limits of about 24.9995 and 25.0006 mm; the 20 readings in the worksheet fall between 24.9998 and 25.0003 mm.
Unlike the baseline, Xiwitab didn’t generate a special cause inspection result panel. Only when all three levels are met can the temporary control in this case be lifted.

06.Predecessor and Successor
Stability studies aren't just isolated conclusions from measuring tools. Beforehand, you need to check if the measurement system is worth monitoring, and afterwards, any tools that pass should be put back into the product control process.

On-site application logic suggestions:
1. If the variation is mainly due to personnel or fixtures, start with a gauge R&R;
2. If a single point shift is stable but changes across the range, do additional linearity and bias checks;
3. If the standard parts are stable but the product chart is still abnormal, go back to the product process I-MR or Xbar-R;
4. If the control limits are so small that they’re near the display resolution, fix the resolution issue first.
⚠️Important boundary note:
This case only covers a single standard part, a single operator, and a short-term window with one measuring tool; it doesn't represent long-term stability across shifts, fixtures, or wide temperature ranges, and it's not directly equivalent to proving the product's process capability.