Welcome to the "Xiao Q Quality Classroom" column! This column is carefully created by Xiwitech, focusing on sharing practical experience in quality management. Here, Xiao Q will become a hands-on expert, guiding everyone to use professional tools, break down real industrial scenarios, and explore solutions together!


This issue's topic:

 All 30 valves have zero failures—how high can we really prove the reliability of the task?


Three-line conclusion


First, all 30 electrically controlled shut-off valves completed the 1,200-hour task under the agreed conditions of 1.6 MPa and 25°C, with zero initial failures; but this only shows that 'these 30 didn't fail,' and doesn’t mean 'reliability is 100%.' 


Second, the Xiwitab single-ratio analysis gives a one-sided 95% confidence lower limit of 0.904966, just slightly above the customer-required 0.90 threshold, leaving a margin of around 0.50 percentage points—statistically meeting the requirement, but barely.


Third, zero-failure data aren’t enough to estimate the Weibull shape or prove longer life; release must pass checks for operating conditions, downtime deductions, failure criteria, and sample independence, all of which are essential.


01. On-site conflict: All 30 units are fine, so why are they still hesitating?

The story starts with an electronic control shut-off valve that hasn't hit the market yet.  


A large industrial fluid control equipment manufacturer developed this valve for the automated production line's gas-liquid circuit. The client’s continuously running equipment needed it to reliably close on command — and the contract was very clear: each unit had to complete a 1,200-hour task under 1.6 MPa and 25°C conditions, with a reliability of at least 90% over the task period, and proof of this had to be provided with a single-sided 95% confidence level.  


The validation team started the tests first thing in the morning. Thirty engineering prototypes were lined up for testing, entering positions A and B in order, coming from two production batches, Alpha and Beta. After 1,200 hours, the results came in: zero failures. All 30 units had “completed the task.”  


The sales team was the first to cheer: “Zero failures! Go ahead and promise even higher reliability!”  


But the quality engineers were feeling uneasy: some running hours might not have accounted for downtime; the leakage criteria on the two stations might not match; and most importantly — does zero failures really prove that the reliability meets the target? How high can it actually be proven?  


The R&D lead also pressed the question: do the results from two batches on two stations actually support the client’s on-site use?  


On Friday, before the review meeting, the quality manager had to sign off the first batch of customer trial units. Sign too early, and calling zero failures a “guarantee of no faults” could mean rework and unwanted warranty claims if the customer’s equipment went down; sign too late, and delaying the trial without reason would hold up delivery.  


The review meeting really had to answer just one question: can this test batch support the reliability requirements for the specified task period?  


Whether a prototype experiences a predetermined failure within 1,200 hours is essentially a binary outcome. First, fix the design and standardize the leakage and functional criteria, then look at the proportion of units that completed the task and the lower bound of confidence. Control charts can monitor process variations, but they don’t prove task reliability directly from zero failures; and data showing zero failures is also insufficient to estimate the Weibull shape or predict longer lifetimes.

表1.png

Table 1 Operating Conditions, Criteria, and Decision Guidelines for Valve Task Reliability Verification


02.Data Reliability: First check whether each unit has actually 'completed the task'

Zero failures could indicate that the design meets the task requirements, but it could also be due to light operating conditions, inconsistent timing criteria, or insufficient sampling. What’s quantified at the statistical lower limit is the sample uncertainty; deviations in test design and records still need to be checked separately.  


Each row represents a prototype, with 30 kept in the order they were put on the rack. The workbook includes ten fields: sample number, rack order, test station, manufacturing batch, test pressure (MPa), ambient temperature (℃), planned task duration (h), actual completed duration (h), first failure count, and task completion status. First failure count is 0 or 1; in this example, it’s 0 for all. Task completion status is all “task period achieved.”  


The test supervisor checks each one against shift records, deducts downtime, inspects endpoint leaks and functional retests, and confirms that measurement equipment is within its valid calibration period. Prototypes stopped early without failing should be recorded as right-censored and not counted as fully successful; even if repaired and retested, they don’t become a new independent prototype.

表2.png

Table 2 Data Dictionary and Statistical Roles


In Xiwitab, select 'Statistics → Basic Statistics → Display Descriptive Statistics,' enter the variables 'Effective Completion Time (h)' and 'First Failure Count,' group by 'Test Station' and 'Manufacturing Batch,' and check the number of non-missing values, missing values, sums, minimum, and maximum.

图1.png

Figure 1 Xiwitab checks task completeness by test bench and manufacturing batch (descriptive statistics screenshot)


Station A and Station B each have 15 units, with batch A having 8 units each and batch B having 7 units each. The number of missing units in each group is zero, and both the minimum and maximum completion times are 1,200 hours, with a total of zero first failures. The table doesn’t show any effective hours or missing results below the task period, so we still can’t rule out errors in downtime deduction. Station equivalence, prototype independence, and consistency with customer operating conditions still need to be confirmed through account records and engineering review.


03.Using the precise lower bound to judge task reliability: what does 0.904966 mean?

In this example, 'reaching the mission duration' is defined as a success event, and the reliability of interest is the probability that similar independent prototypes will complete 1,200 hours under specified conditions. The one-sided 95% lower limit comes from a type of interval construction rule that ensures long-term coverage of at least 95%, and it shouldn’t be interpreted as 'the true overall reliability has a 95% chance of being above this.'


The current version of Xiwitab provides verification test plans in 'Reliability/Survival → Test Plans → Verification' that require life distribution parameters, but there’s no binomial entry for fixed missions without distribution parameters. In this example, we switch to the native single-proportion analysis to answer the same mission reliability question without imposing a life distribution on zero-failure data.


Operation steps:

1. Import the 'Valve Task Records' sheet from the reader's workbook, keep the Chinese column names, and check 30 rows. First, complete the integrity review of the above tasks.


2. Select 'Statistics → Basic Statistics → Single Proportion', use 'One or more samples, one per column', choose 'Task Completion Status', and set the event to 'Reached Task Deadline'.


3. In 'Options', set the confidence level to 95, choose the alternative hypothesis as 'Proportion > Hypothesized Proportion', and select the 'Adjusted Blaker (Exact)' method. Do not check 'Perform Hypothesis Test'. The direction here determines the one-sided lower limit.


图2.png

Figure 2 Screenshot of Xiwitab Single-Ratio Confidence Lower Limit Settings


4.Read the method column of the original report and the '95% lower bound of p'. This report shows 'Clopper-Pearson exact method', with a sample size of 30, 30 successful events, a sample proportion of 1.000000, and a lower bound of 0.904966.

图3.png

Figure 3 Screenshot of Xiwitab task completion rate and unilateral 95% lower limit


According to the reported values, the lower limit is about 90.50%, roughly 0.50 percentage points above the 90% threshold. The statistical criteria are met, but the margin is very small: you can't write the sample proportion of 100% as 100% overall reliability, nor can you promise a 5,000-hour performance based on this. If failures are added or invalid tests are removed, you must document the reasons and rerun the analysis; you can't just use this lower limit.


04.Release Conditions and Follow-up Verification

At the Friday review meeting, the quality lead gave the opinion: 'Trial release limited to specified operating conditions and a 1,200-hour task period.'


The premise is: the test supervisor must complete checks on downtime deductions, failure criteria, and calibration evidence; the R&D lead must confirm the prototype’s independence and the applicability of operating conditions. If any of these are not met, or if the first failure is found during the task period, the release should be postponed, the cause investigated, and effectiveness reassessed.


During the first 90 days of the trial, the R&D lead will collect the actual run hours, first failures, and shutdown info for each unit, and review by manufacturing batch and customer operating conditions. If any failures meet the predetermined criteria, promotion is suspended, and right-censored life analysis is initiated. The 90-day period is a tracking window, not that each unit has completed 1,200 hours; data before the task period cannot be counted as successful.


This verification issue can only be closed after complete records for 30 units, the native one-sided 95% lower limit reaches 0.90, and the operating conditions and measurements have been reviewed with no anomalies. Results from just two batches and two units cannot prove all manufacturing batches and usage environments are equivalent. If later on there’s a need to optimize the valve structure or driving parameters, DOE can be used to test factors and interactions, and independent confirmation runs should validate any changes.


Prerequisites and Follow-up

Prerequisites involve measuring and recording integrity checks: unified timing, downtime deduction, and failure definitions. If there’s early test termination, survival or life analysis methods should be reselected according to a right-censoring structure. For follow-up, if there are enough failure events, life analysis can be used to compare batches and operating conditions; if you want to prove longer missions, a new test plan must be designed and executed first.


Zero failures cannot prove longer life, but a single rigorous zero-failure test can show that "for this mission line, we can hold it."